Correct me if Iam wrong, FFL refers to the level at the top surface of floor finish. This is where all the building element finish levels are referenced from. SFL refers to the level at the top surface of the floor screeding or concrete topping. While SSL refers to the level at the top surface of the structural slab.
What does SMP stand for in construction? Structural Mechanical Piping (SMP)
What is GL in engineering drawing?
GL. ground line or ground level. GP. ground plane.
What is a RL in construction? Reduced level (RL): this is the height or elevation above the point adopted as the site datum for the purpose of establishing levels. To establish the required depths for a drainage system you need to work from the datum point. The datum is taken as a reduced level of 10,000.
What is SSL in architecture?
Secure Socket Layer (SSL) provides security to the data that is transferred between web browser and server. SSL encrypts the link between a web server and a browser which ensures that all data passed between them remain private and free from attack.
What is SMP in civil engineering?
Structural Mechanical Piping (SMP)
What is SMP package?
The Software Maintenance Plan (SMP) ensures you get all the benefits out of your software and reduces your business risk in case of software or hardware issues.
What does SMP Supervisor mean?
As an SMP Supervisor, you will
Oversee the construction of structural, mechanical & piping (SMP) mining components on site. Supervise and control designated project works for all SMP duties.
What is GL and IL?
Manhole rings and cover slabs to suit are manufactured in various depths and diameters to facilitate the range of pipe diameters and actual depth on site from ground level (GL) to invert level (IL).
What is Il in civil engineering?
In civil engineering, the invert level is the base interior level of a pipe, trench or tunnel; it can be considered the “floor” level. … Invert Level is found through measuring the distance from the lowest level of a pipe, to a fixed datum.
What is HP VP and PP in engineering drawing?
Position 1: Parallel to two planes & perpendicular to the other In 3D In 2D Parallel to H.P. Front View – Parallel line to reference line Parallel to V.P. Top View – Parallel Line to reference line Perpendicular to P.P. Side View – Point on the side of front view V.P. a’ Fv b’ X Y a b H.P. TV Y a” P.P. .
Is RL the same as FFL?
I don’t see it that often but engineers and surveyors use R.L. for Relative Level or Reduced Level. It is a measurement of height taken from some known datum. F.F.L is First Floor Level.
What is Il in surveying?
Intermediate sights – all readings taken between back sight and fore sight.
How do you check RL levels?
9. 8 Rise and Fall Method This method consists in finding the difference of level between consecutive points by comparing each point after the first with that immediately preceding it. The reduced level (R.L.) is found by adding rise of subtracting fall to or from the preceding reduced level itself (R.L.).
What is the difference http and https?
HTTPS is HTTP with encryption. The difference between the two protocols is that HTTPS uses TLS (SSL) to encrypt normal HTTP requests and responses. As a result, HTTPS is far more secure than HTTP. A website that uses HTTP has HTTP:// in its URL, while a website that uses HTTPS has HTTPS://.
What is SSL in floor plan?
1. SSL, FFL, SFLABBREVIATIONS. • FINISH FLOOR LEVELFFL• STRUCTURAL FLOORLEVELSFL• STRUCTURAL SLABLEVELSSL.
What is difference between SSL and TLS?
Transport Layer Security (TLS) is the successor protocol to SSL. TLS is an improved version of SSL. It works in much the same way as the SSL, using encryption to protect the transfer of data and information. The two terms are often used interchangeably in the industry although SSL is still widely used.
What is structural mechanical piping?
Structural, mechanical, piping and tankage construction
Installation of heavy mechanical equipment such as crushers, screens, mills, ship loaders, stackers, reclaimers, compressors, process skids, boilers and turbines (gas and steam) … This includes carbon and stainless steel, non-ferrous and exotic piping materials.
Whats does SMP mean?
SMP is an acronym for the term sexual marketplace, and is often used in male-dominated conversations, or in the “manosphere.”
What is Il level in construction?
An invert level is defined as the elevation of the inside-bottom of a pipe, trench, culvert, or tunnel. It may also be considered the “floor level” of a pipe. … Invert levels are determined by measuring the vertical distance from a fixed datum to the lowest level of a pipe.
What is Il and Cl in drainage?
The highest point of a manhole (or other access chamber) is the cover level (CL), which is the height of the cover above a benchmark level, and the difference between Cover Level (CL) and Invert level (IL) is the overall depth of the chamber.
What is general ledger in ERP?
The General Ledger (GL) is the primary accounting record for a business. It tracks all financial transactions and is used to generate the company’s financial statements, including the Income Statement and Balance Sheet.
What does il mean in construction?
IIP – Investors in People. IL – Invert Level.
What does il mean in engineering?
Acronym | Definition |
---|---|
IL | Invert Level (civil engineering) |
IL | Installation and Logistics |
IL | Intact Loop |
IL | Investigatory Leave |